Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
Work is complete and a temporary patches in place but final pavement repair as required for final inspection to pass |
| 04/27/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
Still needs permanent pavement repair |
| 05/27/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
temporary patch is still in place. Non-moratorium, T top style permanent patch, expanding the width of the lane affected will be needed for final approval. |
| 07/06/2026 |
TRSP - ROW - Final |
|
Not Ready |
job is currently in Tucson Water’s work queue |
| 07/17/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
permanent patch required for final approval, notifying Sylvia |
| 08/04/2026 |
TRSP - ROW - Final |
|
Passed |
|