Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Final

Date Description Inspector Results Comments
01/14/2026 TRSP - ROW - Final Re-inspection required Work is complete and a temporary patches in place but final pavement repair as required for final inspection to pass
04/27/2026 TRSP - ROW - Final Re-inspection required Still needs permanent pavement repair
05/27/2026 TRSP - ROW - Final Re-inspection required temporary patch is still in place. Non-moratorium, T top style permanent patch, expanding the width of the lane affected will be needed for final approval.
07/06/2026 TRSP - ROW - Final Not Ready job is currently in Tucson Water’s work queue
07/17/2026 TRSP - ROW - Final Re-inspection required permanent patch required for final approval, notifying Sylvia
08/04/2026 TRSP - ROW - Final Passed