Permit: TR-UTL-1224-02407
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8800 E SPEEDWAY BL
Address NEW:
8800 E SPEEDWAY BL
Apply Date:
12/23/2024
Applicant:
Cox Communications
Description:
PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE.
Permit Reviews
Permit Number - TR-UTL-1224-02407
Permit Status: Complete
Permit Description: PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/30/2024 | RIGHT-OF-WAY REVIEW v.2 | 12/31/2024 | APPROVED |
| 12/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/27/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02407
Permit Status: Complete
Permit Description: PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/27/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/27/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02407
Permite Description: PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | TRSP - ROW - Final | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02407
Permit Description: PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/21/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 04/10/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |