Permit: TR-UTL-1125-01951
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1202 S PALO VERDE AV
Address NEW:
1202 S PALO VERDE AV
Apply Date:
11/10/2025
Applicant:
Ilana Galluzzo
Description:
SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY. ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN. 05/13/2026- Renew for 90 days as of 05/13/26, new expiration date is 08/11/26. 06/11/26- Recieved A TCP and commentary page for revision
Permit Reviews
Permit Number - TR-UTL-1125-01951
Permit Status: Inspections
Permit Description: SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN.
05/13/2026- Renew for 90 days as of 05/13/26, new expiration date is 08/11/26.
06/11/26- Recieved A TCP and commentary page for revision
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 11/19/2025 | REQUIRES RESUBMIT |
| 06/10/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/22/2026 | REQUIRES RESUBMIT |
| 02/04/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/05/2026 | APPROVED |
| 07/06/2026 | RIGHT-OF-WAY REVIEW REVISION v.3 | 07/08/2026 | APPROVED |
| 06/24/2026 | RIGHT-OF-WAY REVIEW REVISION v.2 | 06/30/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1125-01951
Permit Status: Inspections
Permit Description: SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN.
05/13/2026- Renew for 90 days as of 05/13/26, new expiration date is 08/11/26.
06/11/26- Recieved A TCP and commentary page for revision
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/05/2026 | S Palo Verde Av is subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
| 02/06/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 02/06/2026 | Any temporary pedestrian detour shall be ADA compliant at all times and provide a continuous, accessible route and maintained in a safe and accessible condition for the duration of construction |
| 11/10/2025 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts |
| 11/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/10/2025 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1125-01951
Permite Description: SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN.
05/13/2026- Renew for 90 days as of 05/13/26, new expiration date is 08/11/26.
06/11/26- Recieved A TCP and commentary page for revision
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Complete (Recurring) | traffic control in place for both east and westbound travel lanes, keeping hawk lights and sidewalk accessible. Or route is coming southbound from Randolph in the park down to southside of 22nd St. into landscape area before turning eastbound. |
| 08/12/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Complete (Recurring) | Bore pits and potholing in landscape and concrete apron are ongoing |
| 08/17/2026 | TRSP - ROW - Final | N/A | Not Ready | job is still ongoing |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1125-01951
Permit Description: SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN.
05/13/2026- Renew for 90 days as of 05/13/26, new expiration date is 08/11/26.
06/11/26- Recieved A TCP and commentary page for revision
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with NPL and Southwest gas, 811 marks, SunTran notification, and neighborhood flyers are needed. Scheduling mobilization for 8/3. |