Permit: TR-UTL-1125-01951

Parcel: 13007204A

Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting

Date Description Inspector Results Comments
05/13/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Re-inspection required met with Southwest gas and NPL on site, traffic control plan needs an update. Sense contractor was changed. Nearby utility pole on Palo Verde may need bracing, TEP to be contacted. 811 ticket to be produced for all utilities marked in all areas of work affected. Taylor will reschedule a new pre-con meeting once a full and updated traffic control plan is produced.
06/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed New permit and traffic control plan have been developed, Taylor notifying me once mobilization data
07/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on site meeting with NPL and Southwest gas, 811 marks, SunTran notification, and neighborhood flyers are needed. Scheduling mobilization for 8/3.