Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Apply Date:
11/18/2024
Applicant:
Eric Wieduwilt
Description:
Installing public off-site sewer for the I-10 International buildings being built on the SE corner of E. Los Reales and S. Alvernon Way. Sewer extends from existing manhole east of the intersection and extends 110-125lf east and then directly south.

Permit Reviews

Permit Number - TR-UTL-1124-02181
Permit Status: Inspections
Permit Description: Installing public off-site sewer for the I-10 International buildings being built on the SE corner of E. Los Reales and S. Alvernon Way. Sewer extends from existing manhole east of the intersection and extends 110-125lf east and then directly south.
Start Date Submittal Complete Date Status  
01/10/2025 RIGHT-OF-WAY REVIEW v.2 01/10/2025 REQUIRES RESUBMIT Review Details
01/10/2025 RIGHT-OF-WAY REVIEW v.3 01/10/2025 APPROVED Review Details
11/18/2024 RIGHT-OF-WAY REVIEW v.1 11/20/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1124-02181
Permit Status: Inspections
Permit Description: Installing public off-site sewer for the I-10 International buildings being built on the SE corner of E. Los Reales and S. Alvernon Way. Sewer extends from existing manhole east of the intersection and extends 110-125lf east and then directly south.
Total Outstanding Activity Conditions - 2
Date Name
11/19/2024 Traffic control set-up approved between 9AM - 3:30PM
11/19/2024 Vertical Message boards to be placed 5 days in advance of work for all effected Travel directions approaching proposed work area..

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1124-02181
Permit Description: Installing public off-site sewer for the I-10 International buildings being built on the SE corner of E. Los Reales and S. Alvernon Way. Sewer extends from existing manhole east of the intersection and extends 110-125lf east and then directly south.
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Stephen, covered sequence of inspections, submittals of material tickets and testing, awaiting request for 24 hour work/ setup before starting job.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL PUBLIC OFFSITE SEWER PLANS (COT ROW SUBMITTAL) V2_V2.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL PUBLIC OFFSITE SEWER TRAFFIC CONTROL PLANS V3_V3.PDF DOCUMENTS VIEW