Permit: TR-UTL-1026-01773
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
7551 S HOUGHTON RD
Address NEW:
7551 S HOUGHTON RD
Apply Date:
10/12/2026
Applicant:
Cox Communications
Description:
PRJ319263-1: Cox to overlash 442' of CATV aerial fiber & trench 15' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-1026-01773
Permit Status: In review
Permit Description: PRJ319263-1: Cox to overlash 442' of CATV aerial fiber & trench 15' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/12/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01773
Permit Status: In review
Permit Description: PRJ319263-1: Cox to overlash 442' of CATV aerial fiber & trench 15' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/14/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/14/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/14/2026 | Arterial/Collector Pavement Moratorium [Street name] is subject to a pavement moratorium. Any disturbance of existing asphalt will require a 2-inch mill and overlay extending a minimum of 25 feet in each direction from the outside edge of the cut, across all affected travel lanes. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting. |
| 10/14/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/14/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |