Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Permits

Address: 7551 S HOUGHTON RD
Date - 11/22/2024 3:46 p.m.
Total Number Of Permits - (11)
Permit Status Apply Date Expired Date Unit Type Description
TC-UTL-1222-00022 Issued 12/05/2022 03/30/2024 Utilities Permit ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.
T22CM06857 Issued 09/06/2022 05/19/2024 Commercial Building Remove (3) antennas, (3) TMA. Install (9) antennas, (1) surge suppressor, (3) power trunks, (1) fibe
P98AN02059 ISSUED 08/17/1998 N/A ADDRNEW
T05CM01186 FINAL 03/17/2005 12/20/2006 COMBO CELL SITE:CO-LOCATE
T11CM03213 EXPIRED 10/07/2011 06/19/2012 COMBO SWAPPING ANTENNAS ON EXISTING CELL TOWER
T12CM03636 WITHDRWN 06/20/2012 N/A COMBO REPLACE ANTENNAS WITH 8FT LTE ANTENNAS
T13CM01493 EXPIRED 03/14/2013 01/07/2014 COMBO MODIFICATION TO EXISTING CELL TOWER
T17TUP0004 CLOSED 04/06/2017 N/A TUP Temporary Microwave Dish for PC Fair
T22CM03066 FINAL 04/25/2022 04/18/2023 COMBO Replace existing antennas and equipment cabinets at existing wireless facility.
T98CM01770 FINAL 04/23/1998 03/15/1999 COMBO MONOPOLE & MODULAR W/ FENCE:CELL TOWER
T99CM04333 FINAL 09/09/1999 05/24/2000 COMBO SHELTER SYSTEM & FENCE FOR A T & T SYSTEMS

Record Requests

Address: 7551 S HOUGHTON RD
Date - 11/22/2024 3:46 p.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0723-03847 Complete 07/14/2023 07/17/2023 Requests ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.