Permit: TR-UTL-1025-01756
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2802 N FLOWING WELLS RD
Address NEW:
2802 N FLOWING WELLS RD
Apply Date:
10/07/2025
Applicant:
Robert Reynolds - National Barricade
Description:
This franchise project involves the replacement of predominantly 5,182 feet of 1960's vintage 2" steel and 1087 feet of 1987-2021 PE8000/8100 main along with associated service lines. The project is being initiated by the City of Tucson under Job Number U-2024-033. The proposed improvements begin at the intersection of Flowing Wells and Miracle Mile and extend to the intersection of Grant Road. Scope of work includes roadway repaving, and sidewalks/ramps. COT project is scheduled to start during the first quarter of 2026. Due to the soil conditions within the project area, grade cuts will reach depths greater than 3 feet deep, placing the existing pipeline in direct conflict with the proposed grading. In total, the project will involve the installation of 6,063feet of 4" PE8400 main, 12 feet of 2" PE8400 and 14 feet of 1" PE8400 along with 1,590 feet of service line. The main installation method to be used is boring (5'x10' bore pits). 01/15/26 - Request for 90 Day Renewal as of 01/22/2026
Permit Reviews
Permit Number - TR-UTL-1025-01756
Permit Status: Complete
Permit Description: This franchise project involves the replacement of predominantly 5,182 feet of 1960's vintage 2" steel and 1087 feet of 1987-2021 PE8000/8100 main along with associated service lines. The project is being initiated by the City of Tucson under Job Number U-2024-033. The proposed improvements begin at the intersection of Flowing Wells and Miracle Mile and extend to the intersection of Grant Road. Scope of work includes roadway repaving, and sidewalks/ramps. COT project is scheduled to start during the first quarter of 2026. Due to the soil conditions within the project area, grade cuts will reach depths greater than 3 feet deep, placing the existing pipeline in direct conflict with the proposed grading. In total, the project will involve the installation of 6,063feet of 4" PE8400 main, 12 feet of 2" PE8400 and 14 feet of 1" PE8400 along with 1,590 feet of service line. The main installation method to be used is boring (5'x10' bore pits).
01/15/26 - Request for 90 Day Renewal as of 01/22/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01756
Permit Status: Complete
Permit Description: This franchise project involves the replacement of predominantly 5,182 feet of 1960's vintage 2" steel and 1087 feet of 1987-2021 PE8000/8100 main along with associated service lines. The project is being initiated by the City of Tucson under Job Number U-2024-033. The proposed improvements begin at the intersection of Flowing Wells and Miracle Mile and extend to the intersection of Grant Road. Scope of work includes roadway repaving, and sidewalks/ramps. COT project is scheduled to start during the first quarter of 2026. Due to the soil conditions within the project area, grade cuts will reach depths greater than 3 feet deep, placing the existing pipeline in direct conflict with the proposed grading. In total, the project will involve the installation of 6,063feet of 4" PE8400 main, 12 feet of 2" PE8400 and 14 feet of 1" PE8400 along with 1,590 feet of service line. The main installation method to be used is boring (5'x10' bore pits).
01/15/26 - Request for 90 Day Renewal as of 01/22/2026
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/13/2025 | The following extended traffic control set-up times were approved: |
| 10/13/2025 | TEMPORARY NOISE EXEMPTION |
| 10/22/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01756
Permite Description: This franchise project involves the replacement of predominantly 5,182 feet of 1960's vintage 2" steel and 1087 feet of 1987-2021 PE8000/8100 main along with associated service lines. The project is being initiated by the City of Tucson under Job Number U-2024-033. The proposed improvements begin at the intersection of Flowing Wells and Miracle Mile and extend to the intersection of Grant Road. Scope of work includes roadway repaving, and sidewalks/ramps. COT project is scheduled to start during the first quarter of 2026. Due to the soil conditions within the project area, grade cuts will reach depths greater than 3 feet deep, placing the existing pipeline in direct conflict with the proposed grading. In total, the project will involve the installation of 6,063feet of 4" PE8400 main, 12 feet of 2" PE8400 and 14 feet of 1" PE8400 along with 1,590 feet of service line. The main installation method to be used is boring (5'x10' bore pits).
01/15/26 - Request for 90 Day Renewal as of 01/22/2026
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | currently flying Wells is still in process between Grant and miracle mile on their backfill and getting all their lines in a plan on completing it hopefully by April 22 they are currently still on schedule |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01756
Permit Description: This franchise project involves the replacement of predominantly 5,182 feet of 1960's vintage 2" steel and 1087 feet of 1987-2021 PE8000/8100 main along with associated service lines. The project is being initiated by the City of Tucson under Job Number U-2024-033. The proposed improvements begin at the intersection of Flowing Wells and Miracle Mile and extend to the intersection of Grant Road. Scope of work includes roadway repaving, and sidewalks/ramps. COT project is scheduled to start during the first quarter of 2026. Due to the soil conditions within the project area, grade cuts will reach depths greater than 3 feet deep, placing the existing pipeline in direct conflict with the proposed grading. In total, the project will involve the installation of 6,063feet of 4" PE8400 main, 12 feet of 2" PE8400 and 14 feet of 1" PE8400 along with 1,590 feet of service line. The main installation method to be used is boring (5'x10' bore pits).
01/15/26 - Request for 90 Day Renewal as of 01/22/2026
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/19/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/21/2026 | TRSP - ROW - Final | Passed | This is the new permit after they already exhausted their limits of the old permit for renewals, pre-con and all specs same requirements following pack standards from the previous permit revisited with the on-site supervisor everything is still the same continuing the work the new permit number is TR – UTL – 0426–00662 closing the old permit | |
| 04/21/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | New permit number TR – UTL – 0426–00662 is the new permit number for the extension closing. This permit work is still ongoing. They've got about a week or two left. |