Permit: TR-UTL-0926-01699
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
230 W LESTER ST
Address NEW:
230 W LESTER ST
Apply Date:
09/30/2026
Applicant:
Ilana Galluzzo
Description:
- NEW BUSINESS - APPROX 15FT IN CITY ROW TO INSTALL PROPOSED 2" PE MAIN APPROX 5.4 TOTAL SQUARE YARDS IN PAVEMENT, ESTIMATING 2 WORKING DAYS IN ROW - 2, 5X5FT BELL HOLES IN PAVEMNT FOR PROPOSED TIE IN, AND EXISTING SERVICE ABANDONMENT
Permit Reviews
Permit Number - TR-UTL-0926-01699
Permit Status: Inspections
Permit Description: - NEW BUSINESS - APPROX 15FT IN CITY ROW TO INSTALL PROPOSED 2" PE MAIN
APPROX 5.4 TOTAL SQUARE YARDS IN PAVEMENT, ESTIMATING 2 WORKING DAYS IN ROW
- 2, 5X5FT BELL HOLES IN PAVEMNT FOR PROPOSED TIE IN, AND EXISTING SERVICE ABANDONMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01699
Permit Status: Inspections
Permit Description: - NEW BUSINESS - APPROX 15FT IN CITY ROW TO INSTALL PROPOSED 2" PE MAIN
APPROX 5.4 TOTAL SQUARE YARDS IN PAVEMENT, ESTIMATING 2 WORKING DAYS IN ROW
- 2, 5X5FT BELL HOLES IN PAVEMNT FOR PROPOSED TIE IN, AND EXISTING SERVICE ABANDONMENT
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/06/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/06/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 10/13/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0926-01699
Permite Description: - NEW BUSINESS - APPROX 15FT IN CITY ROW TO INSTALL PROPOSED 2" PE MAIN
APPROX 5.4 TOTAL SQUARE YARDS IN PAVEMENT, ESTIMATING 2 WORKING DAYS IN ROW
- 2, 5X5FT BELL HOLES IN PAVEMNT FOR PROPOSED TIE IN, AND EXISTING SERVICE ABANDONMENT
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Scheduled |
Scheduled Inspections
Scheduled Inspections - TR-UTL-0926-01699
Status: Inspections
Description: - NEW BUSINESS - APPROX 15FT IN CITY ROW TO INSTALL PROPOSED 2" PE MAIN
APPROX 5.4 TOTAL SQUARE YARDS IN PAVEMENT, ESTIMATING 2 WORKING DAYS IN ROW
- 2, 5X5FT BELL HOLES IN PAVEMNT FOR PROPOSED TIE IN, AND EXISTING SERVICE ABANDONMENT
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 10/19/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Scheduled |