Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5680 S CAMPBELL AV
Apply Date:
09/30/2026
Applicant:
Cox Communications
Description:
Cox to trench 22', pull 96', and overlash 478' for catv commercial business tie.

Permit Reviews

Permit Number - TR-UTL-0926-01693
Permit Status: Inspections
Permit Description: Cox to trench 22', pull 96', and overlash 478' for catv commercial business tie.
Start Date Submittal Complete Date Status  
09/30/2026 RIGHT-OF-WAY REVIEW v.1 10/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01693
Permit Status: Inspections
Permit Description: Cox to trench 22', pull 96', and overlash 478' for catv commercial business tie.
Total Outstanding Activity Conditions - 7
Date Name
10/01/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/01/2026 Traffic control set-up approved between 9AM - 3:30PM
10/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/07/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
10/07/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding
10/07/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/09/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ319739-1 TCP1_V1.PDF DOCUMENTS VIEW
PRJ319739-1 TCP2_V1.PDF DOCUMENTS VIEW
PRJ319739-1 TUCSON_V1.PDF DOCUMENTS VIEW