Permit: TR-UTL-0926-01619
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address:
1220 S 6TH AV
Address NEW:
1220 S 6TH AV
Apply Date:
09/18/2026
Applicant:
Cox Communications
Description:
Cox to bore 239 for catv commercial business tie.
Permit Reviews
Permit Number - TR-UTL-0926-01619
Permit Status: Approved
Permit Description: Cox to bore 239 for catv commercial business tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 11/16/2026 | APPROVED |
| 09/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/20/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01619
Permit Status: Approved
Permit Description: Cox to bore 239 for catv commercial business tie.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 09/24/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 09/24/2026 | Bus Stop/Route |
| 09/24/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/16/2026 | Russell Av is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting. |
| 11/16/2026 | Any sidewalk, curb, curb and gutter, or other public improvements removed, damaged, undermined, or disturbed by the proposed work shall be removed and replaced in accordance with current City of Tucson standards and specifications. Sidewalk replacement shall be to full panel/joint limits; partial panel replacement is not permitted. Match existing line, grade, width, and cross slope while maintaining all applicable accessibility requirements. Restore all disturbed areas within the public right-of-way to equal or better condition. |
| 11/16/2026 | Potholing operations shall be conducted in a manner that maintains public safety and minimizes impacts on traffic. All excavations shall be properly protected, backfilled, and restored upon completion. The permittee shall be responsible for repairing any settlement or pavement failure resulting from potholing activities at no cost to the City. |