Permit: TR-UTL-0924-01813
Permit Details
Apply Date:
09/20/2024
Applicant:
Bobby Robbins
Description:
INSTALLATION OF NEW 2" PE GAS MAIN, TIEING INTO EXSTING 4" PE MAIN LOCATED IN THE WEST LANE OF TRAFFIC ON E. LIMBERLOST DR. WORK WILL INCLUDE 1 - 5X5FT BELLHOLE IN ASPHALT/DIRT FOR TIE IN ALONG WITH 10FT OF TRENCHING IN DIRT ROW. (Note: Work is conjunction with DP21-0163)
Permit Reviews
Permit Number - TR-UTL-0924-01813
Permit Status: Complete
Permit Description: INSTALLATION OF NEW 2" PE GAS MAIN, TIEING INTO EXSTING 4" PE MAIN LOCATED IN THE WEST LANE OF TRAFFIC ON E. LIMBERLOST DR. WORK WILL INCLUDE 1 - 5X5FT BELLHOLE IN ASPHALT/DIRT FOR TIE IN ALONG WITH 10FT OF TRENCHING IN DIRT ROW.
(Note: Work is conjunction with DP21-0163)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01813
Permit Status: Complete
Permit Description: INSTALLATION OF NEW 2" PE GAS MAIN, TIEING INTO EXSTING 4" PE MAIN LOCATED IN THE WEST LANE OF TRAFFIC ON E. LIMBERLOST DR. WORK WILL INCLUDE 1 - 5X5FT BELLHOLE IN ASPHALT/DIRT FOR TIE IN ALONG WITH 10FT OF TRENCHING IN DIRT ROW.
(Note: Work is conjunction with DP21-0163)
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
09/20/2024 | PRE-CON/PAVEMENT |
09/20/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01813
Permit Description: INSTALLATION OF NEW 2" PE GAS MAIN, TIEING INTO EXSTING 4" PE MAIN LOCATED IN THE WEST LANE OF TRAFFIC ON E. LIMBERLOST DR. WORK WILL INCLUDE 1 - 5X5FT BELLHOLE IN ASPHALT/DIRT FOR TIE IN ALONG WITH 10FT OF TRENCHING IN DIRT ROW.
(Note: Work is conjunction with DP21-0163)
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
12/19/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
12/19/2024 | TRSP - ROW - Final | Passed |