Permit: TR-UTL-0924-01692
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
225 E VALENCIA RD
Address NEW:
225 E VALENCIA RD
Apply Date:
09/10/2024
Applicant:
Description:
180 day= 2-90 Day permit request for City of Tucson PRJ000303. Water line replacement
Permit Reviews
Permit Number - TR-UTL-0924-01692
Permit Status: Complete
Permit Description: 180 day= 2-90 Day permit request for City of Tucson PRJ000303. Water line replacement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/12/2024 | REQUIRES RESUBMIT |
| 09/19/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0924-01692
Permit Status: Complete
Permit Description: 180 day= 2-90 Day permit request for City of Tucson PRJ000303. Water line replacement
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/11/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/11/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/11/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0924-01692
Permit Description: 180 day= 2-90 Day permit request for City of Tucson PRJ000303. Water line replacement
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/26/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/26/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/13/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 03/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Pavement has already been patched. A backfill compaction inspection is no longer needed. | |
| 03/10/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | Work was a waterline replacement, therefore no aerial installation work was completed. | |
| 03/10/2025 | TRSP - ROW - Bituminous Treatment | Passed | TDOT engineer Nick sent an email stating that permanent patch restoration mill and overlay of affected Streets do not need moratorium restoration | |
| 03/10/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work was a waterline replacement. There are very little to no sidewalks in the area. Therefore, there was no impact to sidewalks, no pre-pour or post-pour inspection required. | |
| 03/10/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | The work involved on this permit was replacing a waterline. There are little to no sidewalks in the area. No concrete work was performed. | |
| 03/10/2025 | TRSP - ROW - Drainage - Pipe Installation/Removal | Passed | ||
| 03/10/2025 | TRSP - ROW - Field Change Request | Passed | To the best of my knowledge, no field changes were requested. | |
| 04/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/22/2025 | TRSP - ROW - Final | Passed |