Permit: TR-UTL-0824-01634
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3131 E TRANSCON WY
Address NEW:
3131 E TRANSCON WY
Apply Date:
08/30/2024
Applicant:
Chelsey Bolinger
Description:
P.122865D (KAHNA) - Previously approved/expired permit TR-UTL-1023-02816 – NO WORK WAS DONE BEFORE THE ORIGINAL PERMIT EXPIRED - ACCESS EXISTING MANHOLE #15554B FOR SPLICING.
Permit Reviews
Permit Number - TR-UTL-0824-01634
Permit Status: Complete
Permit Description: P.122865D (KAHNA) - Previously approved/expired permit TR-UTL-1023-02816 – NO WORK WAS DONE BEFORE THE ORIGINAL PERMIT EXPIRED - ACCESS EXISTING MANHOLE #15554B FOR SPLICING.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0824-01634
Permit Status: Complete
Permit Description: P.122865D (KAHNA) - Previously approved/expired permit TR-UTL-1023-02816 – NO WORK WAS DONE BEFORE THE ORIGINAL PERMIT EXPIRED - ACCESS EXISTING MANHOLE #15554B FOR SPLICING.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/03/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/03/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0824-01634
Permit Description: P.122865D (KAHNA) - Previously approved/expired permit TR-UTL-1023-02816 – NO WORK WAS DONE BEFORE THE ORIGINAL PERMIT EXPIRED - ACCESS EXISTING MANHOLE #15554B FOR SPLICING.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control set up not witnessed, all barricades removed, job completed | |
| 12/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | No pre-con meeting held, no impact to right of way, job complete | |
| 12/18/2024 | TRSP - ROW - Final | Passed | No impact to right of way for manhole access, job completed |