Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
08/22/2024
Applicant:
Vickie McCambridge
Description:
Boring 75' across Limberlost Dr, from new Common area location to existing doghouse. Trenching from the existing ped 52' northwest to uncover the existing cable and conduit, to then trench 65' east and relocate the conduit to a new ped in the common area and away from the new sidewalk location.

Permit Reviews

Permit Number - TR-UTL-0824-01579
Permit Status: Complete
Permit Description: Boring 75' across Limberlost Dr, from new Common area location to existing doghouse. Trenching from the existing ped 52' northwest to uncover the existing cable and conduit, to then trench 65' east and relocate the conduit to a new ped in the common area and away from the new sidewalk location.
Start Date Submittal Complete Date Status  
08/22/2024 RIGHT-OF-WAY REVIEW v.1 08/22/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0824-01579
Permit Status: Complete
Permit Description: Boring 75' across Limberlost Dr, from new Common area location to existing doghouse. Trenching from the existing ped 52' northwest to uncover the existing cable and conduit, to then trench 65' east and relocate the conduit to a new ped in the common area and away from the new sidewalk location.
Total Outstanding Activity Conditions - 2
Date Name
08/22/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/22/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01579
Permit Description: Boring 75' across Limberlost Dr, from new Common area location to existing doghouse. Trenching from the existing ped 52' northwest to uncover the existing cable and conduit, to then trench 65' east and relocate the conduit to a new ped in the common area and away from the new sidewalk location.
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/03/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/01/2024 TRSP - ROW - Barricade - Setup/Routine Passed
10/01/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
10/01/2024 TRSP - ROW - Final Passed
10/01/2024 TRSP - ROW - Barricade Takedown Passed

Documents

File Name Document Type  
1168128 - 831 E LIMBERLOST DR 08212024_V1.PDF DOCUMENTS VIEW
PERMIT TEMP_JB1875385_1168128_V1.PDF DOCUMENTS VIEW
WYCO FIELD - 831 E LIMBERLOST DR - 2-WAY FLAGGER - 1168128_V1.PDF DOCUMENTS VIEW