Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8675 E BROADWAY BL
Apply Date:
08/09/2024
Applicant:
Cox Communications
Description:
PRJ275752-1: Cox to overlash 399' of 48ct fiber, remove and replace existing CATV ped with vaulted ped & pull thru 129' of 48ct fiber for system tie.

Permit Reviews

Permit Number - TR-UTL-0824-01492
Permit Status: Complete
Permit Description: PRJ275752-1: Cox to overlash 399' of 48ct fiber, remove and replace existing CATV ped with vaulted ped & pull thru 129' of 48ct fiber for system tie.
Start Date Submittal Complete Date Status  
08/09/2024 RIGHT-OF-WAY REVIEW v.1 08/12/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0824-01492
Permit Status: Complete
Permit Description: PRJ275752-1: Cox to overlash 399' of 48ct fiber, remove and replace existing CATV ped with vaulted ped & pull thru 129' of 48ct fiber for system tie.
Total Outstanding Activity Conditions - 4
Date Name
08/09/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/09/2024 Traffic control set-up approved between 9AM - 3:30PM
08/09/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/09/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0824-01492
Permit Description: PRJ275752-1: Cox to overlash 399' of 48ct fiber, remove and replace existing CATV ped with vaulted ped & pull thru 129' of 48ct fiber for system tie.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/24/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/25/2024 TRSP - ROW - AERIAL INSTALLATION Passed
10/03/2024 TRSP - ROW - Barricade Takedown Passed
10/07/2024 TRSP - ROW - Final Passed