Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel13329014B
JurisdictionTucson, Pima County
City of Tucson ZoningC-1
Tucson WardWard 2
Tucson Registered NeighborhoodCarriage Park
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 8675 E BROADWAY BL
Date - 05/18/2026 1:47 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-65-14 Pantano Area 2724 2768

Permits

Address: 8675 E BROADWAY BL
Date - 05/18/2026 1:47 p.m.
Total Number Of Permits - (16)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-0825-01035 Complete 08/21/2025 11/03/2025 Right-of-Way (ROW) CONTRACTOR WILL BE TRIMMING TREES DOWN WITHIN THE MEDIAN BETWEEN E 22ND ST AND E SPEEDWAY BLVD ON N CAMINO SECO. 7AM-4PM TRAFFIC CONTROL
TR-UTL-0824-01492 Complete 08/09/2024 12/29/2024 Right-of-Way (ROW) - Utility PRJ275752-1: Cox to overlash 399' of 48ct fiber, remove and replace existing CATV ped with vaulted ped & pull thru 129' of 48ct fiber for system tie.
T20OT00453 Expired 06/26/2020 12/23/2020 Sign - Permanent CofC non conf pole sign, 1-illum wall, 1 -illum monu
T10OT01071 FINAL 05/18/2010 04/11/2011 SIGN 18274
T10OT01137 FINAL 05/25/2010 01/03/2011 SIGN 18370
T13EX00190 CLOSED 02/11/2013 04/12/2013 EXCAV STARTING AT POLE #20, NW COR OF BROADWAY BL BLD/CAM SECO NORTH ON CAM SECO 1663LF OF TRENCHING AND BORING
T14CM03418 L OF C 06/05/2014 05/27/2015 COMBO INSTALL WALK THRU ATM AT BROADWAY
T14OT00728 FINAL 06/10/2014 05/04/2015 SIGN 1- ILLUM WALL SIGN
T17OT00738 FINAL 07/19/2017 09/29/2018 SIGN REPAIR OF POLE COVER
T20RW04739 FINAL 08/24/2020 12/02/2020 ROW N.772905-A- ACCESS MH 911 AT CORNER OF E. BROADWAY BLVD AND N. CAMINO SECO FOR SPLICING WORK IN EXISTING MANHOLE. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24HOURS PRIOR TO START OF WORK FOR COORDINATION INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS
T20RW04740 FINAL 08/24/2020 12/01/2020 ROW N.772905-B- ACCESS MH 1714 ALONG N. CAMINO SECO NORTH OF E. BROADWAY BLVD FOR SPLICING WORK ON EXISTING CABLES.
T20RW06491 FINAL 12/15/2020 02/19/2021 ROW From Cox vault at NW Corner of 8675 E Broadway Blvd,remove and replace Vault with Vault ped, Head N. 120' pulling through existing 2" conduit. Place 12" x 12" pot hole and new Cox Ped. continue N. T/B 10' Head W and begin 15' trench/bore placing 2-2" conduit in to out of ROW
T21CM04920 FINAL 06/14/2021 02/19/2022 COMBO Standard style awning - 8' wide X 3' drop X 5' projection
T21RW02157 FINAL 05/04/2021 07/13/2021 ROW Pull 5167' to place 3-1.25" innerduct in existing Centurylink duct directly associated with a small wireless facility. Address changed from 8875 E Broadway Bl listed on application Traffic control setup shall not commence prior to 9:00am and shall be removed prior to 3:30pm daily. Pedestrian access to the bus stop at the southeast corner of Speedway Blvd. and Camino Seco shall be maintained.
T22RW00387 FINAL 02/04/2022 03/13/2022 ROW EMERGENCY - SEWER LINE REPAIR. DIG IN TURN LANE 10’L X 4’W X 10’D FOR SEWER LINE REPAIR. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 9. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 10. MAINTAIN PEDESTRIAN ACCESS 11. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 12. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
TUC-21125 RENEWAL 07/21/1997 09/17/1992 VESSEL