Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7130 S NOGALES HY
Apply Date:
07/16/2026
Applicant:
Alexander Bellmore
Description:
Steel Replacement Project - Over 6000 feet of boring under dirt/concrete/pavement, and under 600 feet of trenching. Crews working along the west side of Nogales Hwy from Vamori St to Teton Dr with lane closures. On the north side of Corona Rd with lane closures. In the alleys and on the streets between 6th Ave and Geronimo Ave from Corona Rd to Los Reales Rd with alley and lane closures.

Permit Reviews

Permit Number - TR-UTL-0726-01179
Permit Status: Needs resubmittal
Permit Description: Steel Replacement Project - Over 6000 feet of boring under dirt/concrete/pavement, and under 600 feet of trenching. Crews working along the west side of Nogales Hwy from Vamori St to Teton Dr with lane closures. On the north side of Corona Rd with lane closures. In the alleys and on the streets between 6th Ave and Geronimo Ave from Corona Rd to Los Reales Rd with alley and lane closures.
Start Date Submittal Complete Date Status  
07/16/2026 RIGHT-OF-WAY REVIEW v.1 08/12/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01179
Permit Status: Needs resubmittal
Permit Description: Steel Replacement Project - Over 6000 feet of boring under dirt/concrete/pavement, and under 600 feet of trenching. Crews working along the west side of Nogales Hwy from Vamori St to Teton Dr with lane closures. On the north side of Corona Rd with lane closures. In the alleys and on the streets between 6th Ave and Geronimo Ave from Corona Rd to Los Reales Rd with alley and lane closures.
Total Outstanding Activity Conditions - 6
Date Name
07/21/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
07/21/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/21/2026 Traffic control set-up approved between 9AM - 3:30PM
07/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/21/2026 ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL