Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1055 W GRANT RD
Address NEW:
1055 W GRANT RD
Apply Date:
07/01/2026
Applicant:
Brittany West
Description:
Overlash 905' of 48ct over 8 spans. Place 1175' of new strand over 8 spans, lash 1175' of 48ct fiber over 8 spans. Place new riser and vault. Bore 500' of 2" conduit at a depth of 3'. Run 500' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault and riser on pole. Place 1310' of new strand over 8 spans, lash 1310' of 48ct fiber over 11 spans.

Permit Reviews

Permit Number - TR-UTL-0726-01092
Permit Status: Inspections
Permit Description: Overlash 905' of 48ct over 8 spans. Place 1175' of new strand over 8 spans, lash 1175' of 48ct fiber over 8 spans. Place new riser and vault. Bore 500' of 2" conduit at a depth of 3'. Run 500' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault and riser on pole. Place 1310' of new strand over 8 spans, lash 1310' of 48ct fiber over 11 spans.
Start Date Submittal Complete Date Status  
07/21/2026 RIGHT-OF-WAY REVIEW v.2 07/21/2026 APPROVED Review Details
07/01/2026 RIGHT-OF-WAY REVIEW v.1 07/10/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01092
Permit Status: Inspections
Permit Description: Overlash 905' of 48ct over 8 spans. Place 1175' of new strand over 8 spans, lash 1175' of 48ct fiber over 8 spans. Place new riser and vault. Bore 500' of 2" conduit at a depth of 3'. Run 500' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault and riser on pole. Place 1310' of new strand over 8 spans, lash 1310' of 48ct fiber over 11 spans.
Total Outstanding Activity Conditions - 6
Date Name
07/07/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
07/07/2026 Traffic control set-up approved between 9AM - 3:30PM
07/07/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/07/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/07/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/07/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01092
Permit Description: Overlash 905' of 48ct over 8 spans. Place 1175' of new strand over 8 spans, lash 1175' of 48ct fiber over 8 spans. Place new riser and vault. Bore 500' of 2" conduit at a depth of 3'. Run 500' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3'. Run 700' of 48 ct fiber. Place new vault and riser on pole. Place 1310' of new strand over 8 spans, lash 1310' of 48ct fiber over 11 spans.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
JB0002537514_PERMIT MAP_V2.PDF DOCUMENTS VIEW
TCP REVISED_V2.PDF DOCUMENTS VIEW