Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0724-01424
Permit Details
Apply Date:
07/31/2024
Applicant:
Think Safety Inc
Description:
Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0724-01424
Permit Status: Complete
Permit Description: Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0724-01424
Permit Status: Complete
Permit Description: Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie.
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/31/2024 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
07/31/2024 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
07/31/2024 | Traffic control set-up approved between 9AM - 3:30PM |
07/31/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
07/31/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0724-01424
Permit Description: Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/24/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
10/28/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
11/12/2024 | TRSP - ROW - Final | Passed |