Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1785 E RIVER RD
Address NEW:
1785 E RIVER RD
Apply Date:
06/01/2026
Applicant:
Brittany West
Description:
Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.

Permit Reviews

Permit Number - TR-UTL-0626-00909
Permit Status: Issued
Permit Description: Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.
Start Date Submittal Complete Date Status  
07/09/2026 RIGHT-OF-WAY REVIEW v.4 07/10/2026 APPROVED Review Details
06/09/2026 RIGHT-OF-WAY REVIEW v.2 06/10/2026 REQUIRES RESUBMIT Review Details
07/06/2026 RIGHT-OF-WAY REVIEW v.3 07/07/2026 REQUIRES RESUBMIT Review Details
06/01/2026 RIGHT-OF-WAY REVIEW v.1 06/08/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0626-00909
Permit Status: Issued
Permit Description: Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.
Total Outstanding Activity Conditions - 10
Date Name
06/03/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
06/03/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
06/03/2026 Traffic control set-up approved between 9AM - 3:30PM
06/03/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/03/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
06/03/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/10/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
07/10/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
07/10/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/10/2026 Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations. Rolling shadow traffic control closures not to exceed 1 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 1 hrs will require full traffic control setups based on road configuration

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
JB0002536028_PERMIT MAP_V1.PDF DOCUMENTS VIEW
TCP REVISION 3_V2.PDF DOCUMENTS VIEW