Permit: TR-UTL-0626-00909
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
1785 E RIVER RD
Address NEW:
1785 E RIVER RD
Apply Date:
06/01/2026
Applicant:
Brittany West
Description:
Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.
Permit Reviews
Permit Number - TR-UTL-0626-00909
Permit Status: Issued
Permit Description: Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2026 | RIGHT-OF-WAY REVIEW v.4 | 07/10/2026 | APPROVED |
| 06/09/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/10/2026 | REQUIRES RESUBMIT |
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/07/2026 | REQUIRES RESUBMIT |
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/08/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0626-00909
Permit Status: Issued
Permit Description: Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber.
Total Outstanding Activity Conditions - 10
| Date | Name |
|---|---|
| 06/03/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/03/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 06/03/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/03/2026 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/03/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/10/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 07/10/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 07/10/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/10/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations. Rolling shadow traffic control closures not to exceed 1 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 1 hrs will require full traffic control setups based on road configuration |