Activity Search: TR-UTL-0626-00909
Activity
Parcel Attributes
| Parcel | 10818716A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Culvert |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 3 |
| Major Street & Route | Scenic Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/16/2026 11:07 p.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0626-00909 | Fees Due | 06/01/2026 | 08/13/2026 | Right-of-Way (ROW) - Utility | Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber. 08/14/26-Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. |