Permit: TR-UTL-0623-01771
Permit Details
Apply Date:
06/12/2023
Applicant:
Think Safety Inc
Description:
PRJ251483-1 COX TO BORE 553' PLACE NEW PED FOR CATV CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0623-01771
Permit Status: Complete
Permit Description: PRJ251483-1 COX TO BORE 553' PLACE NEW PED FOR CATV CONDUIT FOR SYSTEM TIE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/14/2023 | RIGHT-OF-WAY REVIEW v.2 | 06/15/2023 | APPROVED |
06/12/2023 | RIGHT-OF-WAY REVIEW v.1 | 06/13/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0623-01771
Permit Status: Complete
Permit Description: PRJ251483-1 COX TO BORE 553' PLACE NEW PED FOR CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
06/12/2023 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
06/12/2023 | Traffic control set-up approved between 9AM - 3:30PM |
06/12/2023 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01771
Permite Description: PRJ251483-1 COX TO BORE 553' PLACE NEW PED FOR CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/06/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01771
Permit Description: PRJ251483-1 COX TO BORE 553' PLACE NEW PED FOR CATV CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/27/2023 | TRSP - ROW - Final/Close-Out | Passed |