Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Apply Date:
05/28/2026
Applicant:
Marques Perez
Description:
Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0526-00898
Permit Status: Fees due
Permit Description: Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
06/29/2026 RIGHT-OF-WAY REVIEW v.2 06/29/2026 APPROVED Review Details
05/28/2026 RIGHT-OF-WAY REVIEW v.1 06/22/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00898
Permit Status: Fees due
Permit Description: Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 4
Date Name
06/02/2026 Traffic control set-up approved between 9AM - 3:30PM
06/02/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/02/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/02/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Outstanding Inspections

Permit Status: Fees Due
Permit Number: TR-UTL-0526-00898
Permite Description: Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Final N/A Requested

Completed Inspections

Permit Status: Fees Due
Permit Number: TR-UTL-0526-00898
Permit Description: Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/03/2026 TRSP - ROW - Barricade - Setup/Routine Passed TEP is renewing the permit
08/03/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed TEP is renewing their permit
08/07/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Yes everything's compacted for their head or curbs and pre-inspected prior to the poor meet specifications

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2501 N FLOWING WELLS RD PLAN 4 138 YARD_V2.PDF DOCUMENTS VIEW
DMP 138KV AND 230KV TRANSMISSION POLE FOUNDATIONS_V1.PDF DOCUMENTS VIEW
TEP DEMOSS PETRIE SUBSTATION 138KV - DP - 2022-06-03_V1.PDF DOCUMENTS VIEW