Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel10707015A
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-2
Tucson WardWard 3
Tucson Registered NeighborhoodFlowing Wells
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 08/16/2026 5:56 a.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0526-00898 Fees Due 05/28/2026 08/02/2026 Right-of-Way (ROW) - Utility Repaving and curb work for North and South driveways into 138kv Electric Substation, as well as (3) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0160 Wall Package: TC-COM-0923-02166 08/14/26- Renew permit for 30 days as of 08/02/26 new expiration date is 09/01/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2501 N FLOWING WELLS RD PLAN 4 138 YARD_V2.PDF DOCUMENTS VIEW
DMP 138KV AND 230KV TRANSMISSION POLE FOUNDATIONS_V1.PDF DOCUMENTS VIEW
TEP DEMOSS PETRIE SUBSTATION 138KV - DP - 2022-06-03_V1.PDF DOCUMENTS VIEW