Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0525-00806
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7020 S NOGALES HY
Address NEW:
7020 S NOGALES HY
Apply Date:
05/20/2025
Applicant:
Quail Traffic
Description:
EXCAVATING A 5X5 TRENCH AT 7020 S NOGALES HWY TO ABANDON A GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 78' NORTH OF SOUTH P/L
Permit Reviews
Permit Number - TR-UTL-0525-00806
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 7020 S NOGALES HWY TO ABANDON A GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 78' NORTH OF SOUTH P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00806
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH AT 7020 S NOGALES HWY TO ABANDON A GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 78' NORTH OF SOUTH P/L
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/20/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/20/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/21/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00806
Permit Description: EXCAVATING A 5X5 TRENCH AT 7020 S NOGALES HWY TO ABANDON A GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 78' NORTH OF SOUTH P/L
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/27/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/27/2025 | TRSP - ROW - Final | Passed |