Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address:
1801 N STONE AV
Apply Date:
05/23/2024
Applicant:
Andrew Ruiz
Description:
(Request for Withdrawal 6/12/2024) -- Install sewer line on Lester Ave and connect into existing sewer main on Stone Ave - 24 Hour Closure 6AM -6PM Excavation: 3’x10’x170’

Permit Reviews

Permit Number - TR-UTL-0524-01038
Permit Status: Withdrawn
Permit Description: (Request for Withdrawal 6/12/2024) -- Install sewer line on Lester Ave and connect into existing sewer main on Stone Ave - 24 Hour Closure 6AM -6PM Excavation: 3’x10’x170’
Start Date Submittal Complete Date Status  
06/06/2024 RIGHT-OF-WAY REVIEW v.2 06/10/2024 APPROVED Review Details
05/24/2024 RIGHT-OF-WAY REVIEW v.1 06/05/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0524-01038
Permit Status: Withdrawn
Permit Description: (Request for Withdrawal 6/12/2024) -- Install sewer line on Lester Ave and connect into existing sewer main on Stone Ave - 24 Hour Closure 6AM -6PM Excavation: 3’x10’x170’
Total Outstanding Activity Conditions - 3
Date Name
05/24/2024 BUS STOP/ ROUTE
05/24/2024 PRE-CON/PAVEMENT/SIDEWALK
06/05/2024 1) Temporary sewerline shall be completely removed from the Bronx W.A.S.H. floodplain prior to final inspections. Email Angel Flores at stormwater@tucsonaz.gov to schedule an inspection. 2) Prior to commencement of work for this project, a copy of the approved Pima County wastewater permit must be submitted to City of Tucson Engineering Division at TucsonErosionHazardInfo@tusonaz.gov 3) Copy of as-builts are required, submit to City of Tucson Engineering Division at TucsonErosionHazardInfo@tusonaz.gov

Documents

File Name Document Type  
1801 N STONE AV TUCSON -REV_V2.PDF DOCUMENTS VIEW
APPROVED COT PLAN SET_BROTHER JOHN'S SEWER_V1.PDF DOCUMENTS VIEW