Permit: TR-UTL-0426-00629
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1035 N TREAT AV
Address NEW:
1035 N TREAT AV
Apply Date:
04/06/2026
Applicant:
Jesus Orozco
Description:
Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Permit Reviews
Permit Number - TR-UTL-0426-00629
Permit Status: Inspections
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0426-00629
Permit Status: Inspections
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/08/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/08/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 04/08/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/08/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0426-00629
Permite Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0426-00629
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |