Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1035 N TREAT AV
Address NEW:
1035 N TREAT AV
Apply Date:
04/06/2026
Applicant:
Jesus Orozco
Description:
Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.

Permit Reviews

Permit Number - TR-UTL-0426-00629
Permit Status: Inspections
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Start Date Submittal Complete Date Status  
04/07/2026 RIGHT-OF-WAY REVIEW v.1 04/08/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0426-00629
Permit Status: Inspections
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Outstanding Activity Conditions - 4
Date Name
04/08/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/08/2026 Traffic Control set-up approved between 7AM - 5PM
04/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/08/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0426-00629
Permite Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/27/2026 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0426-00629
Permit Description: Permit to install 60 LF of UGE for TEP to the new location for building power through the ROW on Treat.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/15/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/20/2026 TRSP - ROW - Barricade - Setup/Routine Passed
04/23/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
CANYON12 HIMMEL TRAFFIC PLAN_V1.PDF DOCUMENTS VIEW
CONSTRUCTION DRAWING SIGNED BY SC_V1.PDF DOCUMENTS VIEW
HIMMEL SITE PLAN REV1_V1.PDF DOCUMENTS VIEW