Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4150 E LOS REALES RD
Apply Date:
04/25/2025
Applicant:
Cox Communications
Description:
Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-0425-00691
Permit Status: Complete
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Start Date Submittal Complete Date Status  
04/25/2025 RIGHT-OF-WAY REVIEW v.1 04/28/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00691
Permit Status: Complete
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Total Outstanding Activity Conditions - 5
Date Name
04/25/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/25/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
04/25/2025 OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
04/25/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/25/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00691
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/19/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Kevin over the phone. He informed me that work on this permit is still a few weeks out.
06/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/03/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
07/09/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
BI-569192_PRJ291751-1_4150 E LOS REALES RD_TCP_V1.PDF DOCUMENTS VIEW
PRJ291751-1 TUCSON_V1.PDF DOCUMENTS VIEW
PRJ291751-1_TUCSON AERIAL_V1.PDF DOCUMENTS VIEW