Permit: TR-UTL-0425-00691
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4150 E LOS REALES RD
Address NEW:
4150 E LOS REALES RD
Apply Date:
04/25/2025
Applicant:
Cox Communications
Description:
Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0425-00691
Permit Status: Complete
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0425-00691
Permit Status: Complete
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/25/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/25/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 04/25/2025 | OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. |
| 04/25/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/25/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0425-00691
Permit Description: Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Kevin over the phone. He informed me that work on this permit is still a few weeks out. | |
| 06/02/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 07/09/2025 | TRSP - ROW - Final | Passed | Work is complete |