Permit: TR-UTL-0424-00751
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6690 S ALVERNON WY
Address NEW:
6690 S ALVERNON WY
Apply Date:
04/10/2024
Applicant:
Ilana Galluzzo
Description:
(1) 3' x 6' bell hole in dirt along with an approx. 2' x 20' trench in dirt. Crews will be working along West shoulder, South bound side of the road to install new gas service.
Permit Reviews
Permit Number - TR-UTL-0424-00751
Permit Status: Complete
Permit Description: (1) 3' x 6' bell hole in dirt along with an approx. 2' x 20' trench in dirt. Crews will be working along West shoulder, South bound side of the road to install new gas service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0424-00751
Permit Status: Complete
Permit Description: (1) 3' x 6' bell hole in dirt along with an approx. 2' x 20' trench in dirt. Crews will be working along West shoulder, South bound side of the road to install new gas service.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/11/2024 | City Limits Only ROW Permit is only allowed for City of Tucson Limits. |
| 04/11/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/11/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0424-00751
Permit Description: (1) 3' x 6' bell hole in dirt along with an approx. 2' x 20' trench in dirt. Crews will be working along West shoulder, South bound side of the road to install new gas service.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no precon held site was completed and passed 5-20-2924 | |
| 07/22/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete, a final inspection was passed by Travis on 05/20/2024. |