Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel14041124C
JurisdictionTucson
City of Tucson ZoningI-1
Water Course

Washes

Tucson WardWard 5
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 6690 S ALVERNON WY
Date - 09/20/2024 8:44 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-88-01 Country Club - Valencia 7025 7090

Rezoning Cases

Date - 09/20/2024 8:44 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-03-19 Jacome - Valencia Road and Alv C-1 Expired 05/17/2006

Permits

Address: 6690 S ALVERNON WY
Date - 09/20/2024 8:44 a.m.
Total Number Of Permits - (25)
Permit Status Apply Date Expired Date Unit Type Description
TF-FCP-1222-00217 Complete 12/20/2022 12/23/2023 Fire Construction Permit Provide 7 complete wet-pipe sprinkler systems and 1,500 GPM electric fire pump
TD-DEV-1222-00068 Withdrawn 12/07/2022 N/A Development Package "WITHDRAWN at applicant request" DP22-0149
TC-COM-1123-02690 Complete 11/18/2023 11/19/2024 UNIT 110 Commercial Building BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
TR-ROW-1122-00052 Needs Resubmittal 11/07/2022 N/A Right-of-Way (ROW) We will be performing the earthwork and installing underground utilities under Dev Plan DP22-0100 & DP22-0149 on parcels 140-41-1250, 140-41-124E, & 140-41-124C. Parcels 140-41-1250 & 140-41-124E are separated from 140-41-124C by Rodeo Wash, so we will need to cross over the wash with three 4-in HDPE lines in order to get construction water from hydrant meters to a temporary basin located on the parcel 140-41-124E north of the wash. We will also need to cross through the right-of-way on the east end of the site for access between parcels There will be no excavation or traffic impact involved in this right of way permit.
TZ-CMP-1023-00188 Complete 10/10/2023 N/A Zoning Compliance Applicant is is currently constructing its redevelopment of the subject property to include over 700,000 square feet of new Class A industrial development (the “Project”). The Project consists of three industrial buildings which are expected to attract a wide range of industrial, technology, manufacturing and logistics companies. Please note we would like this letter to contain affirmative language stating the following: 1. That the Property is located within the I-1 (Light Industrial) zoning classification; 2. The permitted uses thereunder, with specific confirmation that the use of the Property and structures located thereon (if any) is allowed under the current zoning; 3. That there is compliance with respect to (as applicable): a. Area, width, and depth of the land as a building site for the structures; b. Floor space area for the structures; c. Setback of said structure from property lines; d. Height of said structures; and e. Sufficient parking spaces. 4. That all conditions have been satisfied and an occupancy permit has been issued (if applicable); 5. That the Property is in compliance with all applicable subdivision, ordinances and regulations; and 6. Permitted uses under the current zoning, without the necessity of obtaining a rezoning, conditional use permit or variance, includes, but is not limited to: a. Receiving, storing, assembling, shipping, distributing, preparing, and selling products, materials, food, grocery and liquor items; b. The parking (including tandem parking), storage, and use (including driving into and through the building for loading and unloading and parking inside the building) of automobiles, trucks, machinery and trailers, including outdoor loading and unloading; c. Warehouse and office use; d. Using, handling or storing hazardous materials in accordance with applicable law and in the ordinary course of business, including (i) in any packaged merchandise to be sold, handled, and/or held for shipment to customers, (ii) maintenance of trucks and machinery, and (iii) batteries for any trucks, generators or other machinery or the equipment described in clause (e); e. Installing and operating rooftop equipment such as satellite dishes, cellular antenna, and renewable energy systems, including solar energy systems and related equipment; f. Installing and operating battery storage systems, and electrical generators; and g. Ancillary and related uses for any of the foregoing, all on a twenty-four-hour, seven-days-per-week, fifty-two-weeks-per-year basis.
TC-CFO-0924-00197 Issued 09/13/2024 10/17/2024 UNIT 150 Certificate of Occupancy Tenant improvement of existing warehouse space. New use consists of beer keg sanitation, storage and associated office spaces (F-2, S-2 & B). Type VB construction. Privately funded.
TC-CFO-0924-00193 Denied 09/11/2024 N/A UNIT 150 Certificate of Occupancy This project requires Water Sterilization Report prior to TCO. Please login to your TDC account and submit approved Water Sterilization Report. Once condition is satisfied please re-request TCO. Any questions please email Building_official@tucsonaz.gov Tenant improvement of existing warehouse space. New use consists of beer keg sanitation, storage and associated office spaces (F-2, S-2 & B). Type VB construction. Privately funded.
TF-FCP-0924-00757 Complete 09/05/2024 03/05/2025 Fire Construction Permit Tie-in of new devices to existing fire alarm system
TF-FCP-0824-00703 Void 08/21/2024 N/A Fire Construction Permit VOID-APPLIED FOR SPRINKLER PERMIT INSTEAD OF ALARM PERMIT - Tie-in of new devices to existing fire alarm system
TR-UTL-0824-01457 Void 08/05/2024 N/A Right-of-Way (ROW) - Utility Trench 3', place 2-2" conduits, overlash 809' to existing Cox CATV for system tie on Alvernon
TR-UTL-0723-02039 Complete 07/14/2023 10/14/2023 Right-of-Way (ROW) - Utility WO T59217. TEP to work in/near ROW along East Palo Verde and South Valencia. TEP to complete riser installation and pull in primary cable for new service connection of Tucson Commerce Center.
TF-FCP-0724-00561 Inspections 07/13/2024 01/25/2025 UNIT 150 Fire Construction Permit Modify existing fire sprinkler system
DP22-0149 Complete 06/06/2022 12/13/2026 Development Package Site/Grading/Swppp - Tucson Commerce Center, SOUTH side of Rodeo Wash.
T22CM04003 Complete 05/25/2022 06/16/2024 Commercial Building Shell Bldg.
TF-FCP-0523-00672 Complete 05/05/2023 N/A Fire Construction Permit New underground fire line service for a 244,889 sqft warehouse
TC-CFO-0424-00092 Issued 04/29/2024 06/02/2024 UNIT 110 Certificate of Occupancy BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
TR-UTL-0424-00751 Issued 04/10/2024 05/17/2024 Right-of-Way (ROW) - Utility (1) 3' x 6' bell hole in dirt along with an approx. 2' x 20' trench in dirt. Crews will be working along West shoulder, South bound side of the road to install new gas service.
TF-FOP-0424-00390 Complete 04/08/2024 04/17/2025 UNIT 110 Fire Operational Permit High Pile Storage for Krosswood Doors
TR-PIA-0323-00013 In Review 03/24/2023 01/25/2025 Private Improvement Agreement (PIA) New 6' sidewalk along south side of Valencia between Palo Verde and Alvernon, plus new 5' sidewalk and curb along west side of Alvernon.
TS-PRM-0324-00118 Complete 03/18/2024 10/19/2024 Sign - Permanent (2) Sets of Metal Reverse Pan Channel Logo & Letters
TZ-CMP-0324-00030 Complete 03/06/2024 N/A Zoning Compliance Please provide a Zoning Verification Letter with zone designation, abutting zones and permitted use.
TF-FCP-0224-00138 Complete 02/23/2024 09/28/2024 Fire Construction Permit Add 27 new sprinkler pendents to new office space in existing warehouse.
TC-COM-0224-00338 Issued 02/21/2024 03/10/2025 UNIT 150 Commercial Building Tenant improvement of existing warehouse space. New use consists of beer keg sanitation, storage and associated office spaces (F-2, S-2 & B). Type VB construction. Privately funded.
TC-CFO-0124-00026 Complete 01/18/2024 02/21/2024 Certificate of Occupancy New construction of a 1 story warehouse distribution building.
TC-COM-0124-00107 Issued 01/17/2024 02/25/2025 UNIT 150 Commercial Building New TEP transformer and a 4000amp SES install

Plans

Address: 6690 S ALVERNON WY
Date - 09/20/2024 8:44 a.m.
Total Number Of Plans - (3)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-22-0149 Active 06/06/2022 06/06/2023 -- Commercial Water Harvesting Ordinance Site/Grading/Swppp - Tucson Commerce Center, SOUTH side of Rodeo Wash.
TE-BAS-0723-00093 Active 07/19/2023 N/A -- Stormwater Basin Basin A, along north side of site
TW-WCP-1222-00027 Accepted 12/01/2022 01/26/2024 -- Water Design Plan Tucson Commerce Center - DP1854 - 3rd revision asked for on 6/5

Record Requests

Address: 6690 S ALVERNON WY
Date - 09/20/2024 8:44 a.m.
Total Number Of Requests - (5)
Request Number Status Request Date Completed Date Type Description
REQ-0224-01635 Complete 02/27/2024 02/28/2024 Requests T22CM04003 New construction of a 1 story warehouse distribution building.
REQ-0524-03937 Complete 05/28/2024 05/29/2024 Requests BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
REQ-0824-05379 Complete 08/07/2024 08/08/2024 Requests TC-COM-0124-00107 New TEP transformer and a 4000amp SES install
REQ-0824-05666 Complete 08/21/2024 08/28/2024 Requests New TEP transformer and a 4000amp SES install
REQ-1222-00375 Withdrawn 12/12/2022 N/A Requests "WITHDRAWN at applicant request" DP22-0149 This is already in the system and was intended to be a resubmittal.