Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7311 E IRVINGTON RD
Apply Date:
03/31/2026
Applicant:
Ilana Galluzzo
Description:
EAST SIDE GROVES SPLIT SQUEEZE REPLACEMENT WR 5089351 - City is waiting to pave until SWG plastic pipe replacement work is completed. Request for approval to submit under ROW permit was sent to Gloria Salmeron and DTMpermits email on 3/26/26. Replacement of approx. 44,000' of PE Plastic pipe and associated services via open trench. Majority of work will be done in dirt alleyways, approx 3,500 will take place in pavement. 07/14/26- Renew for 90 days as of 07/20/26 new expiration date is 10/18/26.

Permit Reviews

Permit Number - TR-UTL-0326-00595
Permit Status: Complete
Permit Description: EAST SIDE GROVES SPLIT SQUEEZE REPLACEMENT WR 5089351 - City is waiting to pave until SWG plastic pipe replacement work is completed. Request for approval to submit under ROW permit was sent to Gloria Salmeron and DTMpermits email on 3/26/26. Replacement of approx. 44,000' of PE Plastic pipe and associated services via open trench. Majority of work will be done in dirt alleyways, approx 3,500 will take place in pavement. 07/14/26- Renew for 90 days as of 07/20/26 new expiration date is 10/18/26.
Start Date Submittal Complete Date Status  
04/17/2026 RIGHT-OF-WAY REVIEW v.2 N/A APPROVED Review Details
03/31/2026 RIGHT-OF-WAY REVIEW v.1 04/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00595
Permit Status: Complete
Permit Description: EAST SIDE GROVES SPLIT SQUEEZE REPLACEMENT WR 5089351 - City is waiting to pave until SWG plastic pipe replacement work is completed. Request for approval to submit under ROW permit was sent to Gloria Salmeron and DTMpermits email on 3/26/26. Replacement of approx. 44,000' of PE Plastic pipe and associated services via open trench. Majority of work will be done in dirt alleyways, approx 3,500 will take place in pavement. 07/14/26- Renew for 90 days as of 07/20/26 new expiration date is 10/18/26.
Total Outstanding Activity Conditions - 8
Date Name
04/07/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
04/07/2026 Traffic control set-up approved between 9AM - 3:30PM
04/07/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/07/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
04/07/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
04/07/2026 Please see attachments for storm to shade conditions.
04/08/2026 Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way.
04/08/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00595
Permit Description: EAST SIDE GROVES SPLIT SQUEEZE REPLACEMENT WR 5089351 - City is waiting to pave until SWG plastic pipe replacement work is completed. Request for approval to submit under ROW permit was sent to Gloria Salmeron and DTMpermits email on 3/26/26. Replacement of approx. 44,000' of PE Plastic pipe and associated services via open trench. Majority of work will be done in dirt alleyways, approx 3,500 will take place in pavement. 07/14/26- Renew for 90 days as of 07/20/26 new expiration date is 10/18/26.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Awaiting survey before mobilization, estimating 5/5 start date, barricade set up and backfill inspections will be completed in segments with reoccurring check ups
10/14/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete and traffic control for this permit has been removed
10/14/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
10/19/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW