Permit: TR-UTL-0326-00502
Permit Details
Apply Date:
03/11/2026
Applicant:
Kristine Schwartz
Description:
3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities *spoke with Gabriel Rascon regarding this permit*
Permit Reviews
Permit Number - TR-UTL-0326-00502
Permit Status: Complete
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities
*spoke with Gabriel Rascon regarding this permit*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00502
Permit Status: Complete
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities
*spoke with Gabriel Rascon regarding this permit*
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/13/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/13/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/13/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00502
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities
*spoke with Gabriel Rascon regarding this permit*
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch | |
| 04/15/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch | |
| 04/15/2026 | TRSP - ROW - Final | Passed | all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch |