Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
122 E 5TH ST
Address NEW:
122 E 5TH ST
Apply Date:
03/11/2026
Applicant:
Kristine Schwartz
Description:
3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities *spoke with Gabriel Rascon regarding this permit*

Permit Reviews

Permit Number - TR-UTL-0326-00502
Permit Status: Complete
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities *spoke with Gabriel Rascon regarding this permit*
Start Date Submittal Complete Date Status  
03/12/2026 RIGHT-OF-WAY REVIEW v.1 03/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00502
Permit Status: Complete
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities *spoke with Gabriel Rascon regarding this permit*
Total Outstanding Activity Conditions - 4
Date Name
03/13/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
03/13/2026 Traffic Control set-up approved between 7AM - 5PM
03/13/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/13/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00502
Permit Description: 3 5x5 bellholes in the intersection of 5th St and Ferro Ave for crews to pothole gas facilities *spoke with Gabriel Rascon regarding this permit*
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/15/2026 TRSP - ROW - Barricade - Setup/Routine Passed all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch
04/15/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch
04/15/2026 TRSP - ROW - Final Passed all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch