Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TR-UTL-0326-00502

Parcel: 117042350


Addresses:

122 E 5TH ST

Inspection Status: Passed

Inspection History: TRSP - ROW - Barricade - Setup/Routine

Date Description Inspector Results Comments
04/15/2026 TRSP - ROW - Barricade - Setup/Routine Passed all work on this permit was completed before the 411 came through for location of the end of the main for Southwest gas pothole has been filled with permanent asphalt patch