Permit: TR-UTL-0326-00463
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1601 E GLENN ST
Address NEW:
1601 E GLENN ST
Apply Date:
03/06/2026
Applicant:
Ilana Galluzzo
Description:
**CONTINUATION OF PERMIT TR-UTL-0725-01163 EXPIRES 3/22/26** REPLACEMENT PROJECT - 12" STEEL MAIN - GLENN ST FEEDER REPLACEMENT - Crews will open trench approx. 12,500 feet in pavement along Glenn St starting from Cherry Ave to Alvernon Way. Night work anticipated at all major intersections. Single permit approved by Gloria Salmeron . Please include her on communications Gloria.Salmeron@tucsonaz.gov 05/12/26- TCP was sent for revision.
Permit Reviews
Permit Number - TR-UTL-0326-00463
Permit Status: Complete
Permit Description: **CONTINUATION OF PERMIT TR-UTL-0725-01163 EXPIRES 3/22/26**
REPLACEMENT PROJECT - 12" STEEL MAIN - GLENN ST FEEDER REPLACEMENT - Crews will open trench approx. 12,500 feet in pavement along Glenn St starting from Cherry Ave to Alvernon Way. Night work anticipated at all major intersections. Single permit approved by Gloria Salmeron . Please include her on communications Gloria.Salmeron@tucsonaz.gov
05/12/26- TCP was sent for revision.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/11/2026 | REQUIRES RESUBMIT |
| 03/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/18/2026 | APPROVED |
| 05/05/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 05/29/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00463
Permit Status: Complete
Permit Description: **CONTINUATION OF PERMIT TR-UTL-0725-01163 EXPIRES 3/22/26**
REPLACEMENT PROJECT - 12" STEEL MAIN - GLENN ST FEEDER REPLACEMENT - Crews will open trench approx. 12,500 feet in pavement along Glenn St starting from Cherry Ave to Alvernon Way. Night work anticipated at all major intersections. Single permit approved by Gloria Salmeron . Please include her on communications Gloria.Salmeron@tucsonaz.gov
05/12/26- TCP was sent for revision.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 03/09/2026 | The following extended traffic control set-up times were approved: |
| 03/17/2026 | A copy of the approved Traffic Control Plan shall be kept on-site at all times and available for inspection. The City reserves the right to modify or require adjustments to the traffic control plan in the field if conditions are determined to be unsafe or causing unnecessary traffic impacts. |
| 03/17/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/17/2026 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way |
| 03/17/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 03/17/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 03/17/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 03/17/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 03/17/2026 | The contractor shall coordinate all construction activities and traffic control with other active projects and traffic control operations in the area. Traffic control shall be adjusted as necessary to avoid conflicts and maintain safe traffic flow. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00463
Permit Description: **CONTINUATION OF PERMIT TR-UTL-0725-01163 EXPIRES 3/22/26**
REPLACEMENT PROJECT - 12" STEEL MAIN - GLENN ST FEEDER REPLACEMENT - Crews will open trench approx. 12,500 feet in pavement along Glenn St starting from Cherry Ave to Alvernon Way. Night work anticipated at all major intersections. Single permit approved by Gloria Salmeron . Please include her on communications Gloria.Salmeron@tucsonaz.gov
05/12/26- TCP was sent for revision.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Script read 2nd pre-con for country club in Glenn for the tie in they're gonna be doing on the 20th and 21st at country club and Glenn this project is a continuation for the final gas up and backfill they will be needing a total of six days to do this starting on the 18th all the way up and down Glenn for the gas up in Tie ins this potentially includes the backfill as well. They should be done with this project by the middle of June if they stay on schedule. | |
| 06/15/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/14/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All patches have been completed to the requested standard T top patch for the southwest gas project | |
| 07/14/2026 | TRSP - ROW - Final | Passed | All patches have been completed to the requested standard T top patch for the southwest gas project |