Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3693 S CAMINO SECO
Apply Date:
03/21/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 1" water service with a 5/8" meter

Permit Reviews

Permit Number - TR-UTL-0325-00484
Permit Status: Complete
Permit Description: Installing a 1" water service with a 5/8" meter
Start Date Submittal Complete Date Status  
03/25/2025 RIGHT-OF-WAY REVIEW v.1 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00484
Permit Status: Complete
Permit Description: Installing a 1" water service with a 5/8" meter
Total Outstanding Activity Conditions - 4
Date Name
03/26/2025 Traffic Control set-up approved between 7AM - 5PM
03/26/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
03/26/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
03/27/2025 ARTERIAL/COLLECTOR - S CAMINO SECO IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00484
Permit Description: Installing a 1" water service with a 5/8" meter
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/05/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete
05/05/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed Work is complete
05/05/2025 TRSP - ROW - Barricade Takedown Passed Work is complete
05/05/2025 TRSP - ROW - Final Passed Work is complete, contractor punched under Camino Seco, no damage or impact to road.
05/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I met with Kenny from Tricon on site to discuss the waterline install across Camino Seco. This street is currently under a moratorium and we discussed the 25 foot mill and fill on either side of the trench. Backfill will be 100% AB and work hours will be 7 AM to 5 PM.