Permit: TR-UTL-0325-00484

Parcel: 13613049E


Addresses:

3693 S CAMINO SECO

Inspection Status: Passed

Inspection History: TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting

Date Description Inspector Results Comments
05/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I met with Kenny from Tricon on site to discuss the waterline install across Camino Seco. This street is currently under a moratorium and we discussed the 25 foot mill and fill on either side of the trench. Backfill will be 100% AB and work hours will be 7 AM to 5 PM.