Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0325-00435
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2555 E IRVINGTON RD
Address NEW:
2555 E IRVINGTON RD
Apply Date:
03/14/2025
Applicant:
Richard Sanders
Description:
wo#2997639 2555 e irvington rd 14-14-32 se 14-14-32 se dropping a valve at the northeast corner in asphalt 6lf/ar
Permit Reviews
Permit Number - TR-UTL-0325-00435
Permit Status: Inspections
Permit Description: wo#2997639 2555 e irvington rd 14-14-32 se 14-14-32 se dropping a valve at the northeast corner in asphalt 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00435
Permit Status: Inspections
Permit Description: wo#2997639 2555 e irvington rd 14-14-32 se 14-14-32 se dropping a valve at the northeast corner in asphalt 6lf/ar
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/18/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/18/2025 | Emergency – After the fact permit – a TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Tucson Water to address since DTM did not have an opportunity to review, approve or inspect work. |
| 03/18/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0325-00435
Permit Description: wo#2997639 2555 e irvington rd 14-14-32 se 14-14-32 se dropping a valve at the northeast corner in asphalt 6lf/ar
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/11/2025 | TRSP - ROW - Final | Passed |