Permit: TR-UTL-0325-00368
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1331 W SPEEDWAY BL
Address NEW:
1331 W SPEEDWAY BL
Apply Date:
03/04/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Permit Reviews
Permit Number - TR-UTL-0325-00368
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2025 | RIGHT-OF-WAY REVIEW v.2 | 03/12/2025 | REQUIRES RESUBMIT |
| 03/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/06/2025 | REQUIRES RESUBMIT |
| 03/20/2025 | RIGHT-OF-WAY REVIEW v.3 | 03/20/2025 | REQUIRES RESUBMIT |
| 03/25/2025 | RIGHT-OF-WAY REVIEW v.4 | 03/26/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00368
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 03/05/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 03/06/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 03/06/2025 | The following extended traffic control set-up times were approved: |
| 03/06/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/26/2025 | SWG & NBC to make re-notification of work and coordinate Residential Access with effected Residence prior to start of work.. Field adjustment to be confirmed with inspection.. |
| 03/26/2025 | Vertical Message Boards: Vertical Message boards to be placed 5 days in advance of start of work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00368
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/02/2025 | TRSP - ROW - Final | Passed |