Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1331 W SPEEDWAY BL
Apply Date:
03/04/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair gas leak

Permit Reviews

Permit Number - TR-UTL-0325-00368
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Start Date Submittal Complete Date Status  
03/11/2025 RIGHT-OF-WAY REVIEW v.2 03/12/2025 REQUIRES RESUBMIT Review Details
03/04/2025 RIGHT-OF-WAY REVIEW v.1 03/06/2025 REQUIRES RESUBMIT Review Details
03/20/2025 RIGHT-OF-WAY REVIEW v.3 03/20/2025 REQUIRES RESUBMIT Review Details
03/25/2025 RIGHT-OF-WAY REVIEW v.4 03/26/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00368
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Outstanding Activity Conditions - 6
Date Name
03/05/2025 PRE-CON/PAVEMENT/SIDEWALK
03/06/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
03/06/2025 The following extended traffic control set-up times were approved:
03/06/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
03/26/2025 SWG & NBC to make re-notification of work and coordinate Residential Access with effected Residence prior to start of work.. Field adjustment to be confirmed with inspection..
03/26/2025 Vertical Message Boards: Vertical Message boards to be placed 5 days in advance of start of work.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00368
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/02/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/02/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1331 W SPEEDWAY BLVD NIGHT REVISED_V1.PDF DOCUMENTS VIEW
1331 W SPEEDWAY BLVD_V1.PDF DOCUMENTS VIEW
SIGNED-TEMPORARY NOISE EXEMPTION---- 1331 W SPEEDWAY BLVD_V1.PDF DOCUMENTS VIEW