Permit: TR-UTL-0226-00241
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
502 S FREMONT AV
Address NEW:
502 S FREMONT AV
Apply Date:
02/09/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" Fire Protection Service, 3-1" water services with 3/4" Meters, and 1 system abandonment
Permit Reviews
Permit Number - TR-UTL-0226-00241
Permit Status: Inspections
Permit Description: Installing a 4" Fire Protection Service, 3-1" water services with 3/4" Meters, and 1 system abandonment
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00241
Permit Status: Inspections
Permit Description: Installing a 4" Fire Protection Service, 3-1" water services with 3/4" Meters, and 1 system abandonment
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/11/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/11/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0226-00241
Permit Description: Installing a 4" Fire Protection Service, 3-1" water services with 3/4" Meters, and 1 system abandonment
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |