Permit: TR-UTL-0224-00338
Permit Details
Apply Date:
02/16/2024
Applicant:
Desert Barricades LLC
Description:
WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913. Updated 5/21/2024 - Request for 90 day extension as of 5/26/2024
Permit Reviews
Permit Number - TR-UTL-0224-00338
Permit Status: Complete
Permit Description: WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913.
Updated 5/21/2024 - Request for 90 day extension as of 5/26/2024
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00338
Permit Status: Complete
Permit Description: WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913.
Updated 5/21/2024 - Request for 90 day extension as of 5/26/2024
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/20/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
02/20/2024 | Traffic control set-up approved between 9AM - 3:30PM |
02/20/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
02/20/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00338
Permit Description: WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913.
Updated 5/21/2024 - Request for 90 day extension as of 5/26/2024
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | starting in two to three weeks. | |
08/28/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | Zach Staten, work already completed | |
08/29/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Zachary Staten | |
08/29/2024 | TRSP - ROW - Final/Close-Out | Passed | Zachary Staten | |
08/29/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Zachary Staten: no concrete needed for project | |
08/29/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Zachary Staten: no concrete needed for this permit. |