Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2855 S PANTANO RD
Search
Annexations & Original City Zoning (OCZ)
Address: 2855 S PANTANO RD
Date - 12/25/2024 3:43 p.m.
Total Number Of Annexations & Original City Zoning (2)
Rezoning Cases
Date - 12/25/2024 3:43 p.m.
Total Number Of Rezone Cases - (2)
Special Development Requests & Requirements
Address: 2855 S PANTANO RD
Date - 12/25/2024 3:43 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000001962 | CLOSED | 09/09/2009 | N/A | Historical Information |
Permits
Address: 2855 S PANTANO RD
Date - 12/25/2024 3:43 p.m.
Total Number Of Permits - (8)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-1222-00374 | Complete | 12/05/2022 | 12/02/2022 | Right-of-Way (ROW) - Utility | AFTER-THE-FACT: TEP REPLACED INSULATOR ON POLE AS AN EMERGENCY. WO T59296. | |
TR-UTL-1122-00149 | Issued | 11/02/2022 | 02/19/2023 | Right-of-Way (ROW) - Utility | WO#T32342. Install 2 Anchors (dig 2-2' holes in dirt). Remove 7 Poles & 2,800' of overhead wire. | |
T22RW01322 | Complete | 04/05/2022 | 03/01/2023 | Right-of-Way (ROW) | WO#6333388. TEP to trench & install 3,100' of conduit & cable, 7 above-grade cabinets & 8 sub-surface vaults. All pavement and concrete to be replaced as required. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
TR-UTL-0223-00942 | Issued | 02/22/2023 | 04/26/2023 | Right-of-Way (ROW) - Utility | RE: Permit T22RW01322: WO 6333388 & T32072. TEP to trench & install 3,100' of conduit & cable, 7 above-grade cabinets & 8 sub-surface vaults. All pavement and concrete to be replaced as required. | |
TR-UTL-0224-00338 | Complete | 02/16/2024 | 08/24/2024 | Right-of-Way (ROW) - Utility | WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913. Updated 5/21/2024 - Request for 90 day extension as of 5/26/2024 | |
TR-UTL-0223-00763 | Complete | 02/03/2023 | 06/20/2023 | Right-of-Way (ROW) - Utility | RE: Old Permit TR-UTL-1122-00149. WO# T32342. Install 2 Anchors (dig 2-2' holes in dirt). Remove 7 Poles & 2,800' of overhead wire. | |
T05OT03184 | FINAL | 12/22/2005 | 06/20/2006 | SIGN | 10313 | |
T11OT02165 | FINAL | 11/18/2011 | 05/19/2012 | SIGN | SIGN 20062 change copy on DF sign |
Plans
Address: 2855 S PANTANO RD
Date - 12/25/2024 3:43 p.m.
Total Number Of Plans - (2)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T10SE00059 | Approved | 05/27/2010 | N/A | -- Zoning Examiner Special Exception | SE-10-59 Clearwire - Pantano - A special exception to allow a communications facility on a new 50-foot-tall monpole on a 3.80-acre site and associated ground equipment. | |
T09PRE0089 | APPLIED | 09/30/2009 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | A request for a presubmittal meeting to discuss a future rezoning application to allow a New 50' MonoPole at an existing storage facility, to provide coverage in the immediate area. |
Record Requests
Address: 2855 S PANTANO RD
Date - 12/25/2024 3:43 p.m.
Total Number Of Requests - (4)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0123-00720 | Complete | 01/12/2023 | 01/12/2023 | Requests | WO#T32342. Install 2 Anchors (dig 2-2' holes in dirt). Remove 7 Poles & 2,800' of overhead wire. |
REQ-0423-02116 | Complete | 04/13/2023 | 04/21/2023 | Requests | *PLEASE RENEW FOR 60 DAYS* RE: Old Permit TR-UTL-1122-00149. WO# T32342. Install 2 Anchors (dig 2-2' holes in dirt). Remove 7 Poles & 2,800' of overhead wire. |
REQ-0524-03810 | Complete | 05/21/2024 | 05/21/2024 | Requests | **PLEASE RENEW FOR 90 DAYS** WO T103534. TEP WILL BE WORKING IN ROW TO INSTALL NEW 4” DUCT FOR RELOCATION OF AN EXISTING FIBER. TEP WILL DIG APPROX., 60’ OF 36” DEPTH BY 12” WIDE. THE TRENCH WILL START AT THE EXISTING COMM BOX LOCATED ON THE DIRT SIDE BETWEEN EDGE OF CURB TO THE EDGE OF ROW. ALL DIGGING WILL NOT IMPACT TRAFFIC. TEP POC: Luis Del Rasso @ (520) 360-8913. |
REQ-1222-00428 | Complete | 12/15/2022 | 01/03/2023 | Requests | (PLEASE RENEW FOR 60 DAYS) WO#6333388. TEP to trench & install 3,100' of conduit & cable, 7 above-grade cabinets & 8 sub-surfac; Work Order: 6333388 |