Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8041 E ESCALANTE RD
Apply Date:
01/02/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 4-1" water services

Permit Reviews

Permit Number - TR-UTL-0126-00001
Permit Status: Complete
Permit Description: Installing 4-1" water services
Start Date Submittal Complete Date Status  
01/02/2026 RIGHT-OF-WAY REVIEW v.1 01/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00001
Permit Status: Complete
Permit Description: Installing 4-1" water services
Total Outstanding Activity Conditions - 2
Date Name
01/02/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/02/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0126-00001
Permit Description: Installing 4-1" water services
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/13/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Site is ready for work to begin. I have had several pre construction meeting with Ken from Tricon several times. Multiple trenched will require one large patch. This portion of Escalante is not covered under moratorium. T-top patch that encompasses all trenches will be required.
02/10/2026 TRSP - ROW - Barricade - Setup/Routine Passed Contractor follow the approved traffic control plan
02/10/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
02/10/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
8041 - 8047 E. ESCALANTE RD 1 - 2 DRAWING_V1.PDF DOCUMENTS VIEW
8041 8047 E ESCALANTE RD-1-MODEL_V1.PDF DOCUMENTS VIEW