Inspection Status: Passed
Inspection History: TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting
| Date |
Description |
Inspector |
Results |
Comments |
| 01/13/2026 |
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting |
|
Passed |
Site is ready for work to begin. I have had several pre construction meeting with Ken from Tricon several times. Multiple trenched will require one large patch. This portion of Escalante is not covered under moratorium. T-top patch that encompasses all trenches will be required. |