Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
4798 N 1ST AV
Address NEW:
4798 N 1ST AV
Apply Date:
11/10/2025
Applicant:
James Redding
Description:
Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).

Permit Reviews

Permit Number - TR-ROW-1125-01391
Permit Status: Inspections
Permit Description: Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).
Start Date Submittal Complete Date Status  
11/10/2025 RIGHT-OF-WAY REVIEW v.1 11/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1125-01391
Permit Status: Inspections
Permit Description: Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).
Total Outstanding Activity Conditions - 7
Date Name
11/10/2025 Bike Lane Access and Accommodation Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions. Bike lane can be maintained and Share Pedestrian detour path with proper Signing
11/10/2025 Multiple jurisdictions
11/10/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
11/10/2025 PRE-CON/ SIDEWALK
11/10/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
11/10/2025 Traffic control set-up approved between 9AM - 3:30PM
11/10/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-1125-01391
Permite Description: Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Barricade - Setup/Routine N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TR-ROW-1125-01391
Status: Inspections
Description: Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).
Scheduled Date Description Entered By Entered Date
12/08/2025 TRSP - ROW - Barricade - Setup/Routine Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
25-0075B_V1.PDF DOCUMENTS VIEW
25-0075C_V1.PDF DOCUMENTS VIEW
25-0075_V1.PDF DOCUMENTS VIEW
DEVINE RESERVOIR ELEC_SIGNED 11-5-2025_V1.PDF DOCUMENTS VIEW