Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel10819009B
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningSH
Tucson WardWard 3
Major Street & Route

Scenic Route

National Register Historic DistrictRillito Racetrack Historic District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Historic Records Requests

Address: 4798 N 1ST AV
Date - 12/06/2025 4:51 a.m.
Total Number Of Historic Records Requests - (1)
Name Action
Address: 4798 N 1ST AV - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 4798 N 1ST AV
Date - 12/06/2025 4:51 a.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-82-48 Oracle Rd. - Wetmore Rd. II 5646 5651
C15-96-02 River Rd / 1st Av 8758 8839

Rezoning Cases

Date - 12/06/2025 4:51 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-89-50 Pima County - 1st Avenue B-2 Denied 04/07/2009

Special Development Requests & Requirements

Address: 4798 N 1ST AV
Date - 12/06/2025 4:51 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000003364 CLOSED 02/07/2011 N/A Historical Information

Permits

Address: 4798 N 1ST AV
Date - 12/06/2025 4:51 a.m.
Total Number Of Permits - (19)
Permit Status Apply Date Expired Date Unit Type Description
T20CM07963 Approved 11/11/2020 N/A Commercial Building REPL CELL TOWER ANTENNAS
TR-ROW-1125-01391 Inspections 11/10/2025 12/01/2026 Right-of-Way (ROW) Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir).
TR-ROW-1123-01336 Complete 11/08/2023 05/13/2024 Right-of-Way (ROW) The contractor will be installing Solar Flashers for the Fire Department for Abel Rosales for the City of Tucson. Sidewalk will be available for pedestrians.
TR-ROW-0625-00851 Needs Resubmittal 06/24/2025 N/A Right-of-Way (ROW) Installation of NEW UGC for communications. New fiber optic install for IT connection from FS 20 to Devine Reservoir.
T22RW01847 In Review 05/16/2022 10/14/2022 Right-of-Way (ROW) 600' OF BORE, INSTALL NEW POWER SUPPLY ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE; Work Order: 83626
DP19-0073 Complete 03/25/2019 05/30/2020 Development Package SITE - Tucson Fire Dept, Station 20, commercial solar.
T04BU00996 FINAL 04/26/2004 12/21/2009 GRADING GRADING:0 CUT & 11600 CY FILL
T04BU02407 EXPIRED 10/01/2004 09/26/2005 TEMP-FBB TEMP FBB:CONSTRUCTION TRAILER & ELECTRIC
T04CM01865 EXPIRED 04/26/2004 01/19/2005 COMBO SITE:FIRE STATION
T04CM02431 C OF O 05/28/2004 11/28/2006 COMBO FIRE STATION #20, C OF O ISSUED 06/01/2006, REPRINTED 07/28/09
T04EX00805 CLOSED 08/10/2004 05/07/2005 EXCAV EXCAV:266 LF DRIVEWAYS/RETURNS/UTILITY TRENCH
T04OT00840 FINAL 04/26/2004 N/A FLOODPLN FLOODPLAIN USE PERMIT
T04OT01540 FINAL 08/03/2004 07/25/2005 SIGN SIGN:7545
T05BU00086 FINAL 01/12/2005 09/18/2005 SPKLR FIRE SPKR:ADD 122
T05BU00528 FINAL 03/07/2005 09/21/2005 BUILD FIRE SPKR:KITCHEN FIRE EXHAUST HOOD SYSTEM
T06OT00909 FINAL 03/31/2006 11/28/2006 SIGN 10948
T19CM02018 FINAL 03/21/2019 04/26/2020 COMBO PV CANOPY SYSTEM
T19RW02786 FINAL 05/16/2019 09/18/2019 ROW From the COX ped on the NW corner of 4502 N 1st Ave, begin 312' pull through existing conduit heading North, continue 118' pull through heading West. 353' pull through heading North , continue pull through, West 35' to out of ROW.
T19RW05961 FINAL 10/09/2019 12/09/2019 ROW Original Permit-T19RW02786- Start Point: From the COX ped on the NW corner of 4502 N 1st Ave, begin 312' pull through existing conduit heading North, continue 118' pull through heading West. 353' pull through heading North , continue pull through, West 35' to out of ROW NOTES: AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. 1 St is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.

Plans

Address: 4798 N 1ST AV
Date - 12/06/2025 4:51 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T05BA00131 Approved 06/27/2005 N/A -- Stormwater Basin