Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1022-00002
Permit Details
Apply Date:
10/27/2022
Applicant:
David Marhefka
Description:
This is a Tucson Clean and Beautiful Neighborhood GSI projects. The project includes 9 back of curb rainwater harvesting basins with curb cuts and several microbasins. These basins will be planted with native trees and shrubs. The project is approximately 500 LF of excavation. The Bronx Neighborhood association has agreed to help maintain the site.
Permit Reviews
Permit Number - TR-ROW-1022-00002
Permit Status: Complete
Permit Description: This is a Tucson Clean and Beautiful Neighborhood GSI projects. The project includes 9 back of curb rainwater harvesting basins with curb cuts and several microbasins. These basins will be planted with native trees and shrubs. The project is approximately 500 LF of excavation. The Bronx Neighborhood association has agreed to help maintain the site.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/03/2022 | RIGHT-OF-WAY REVIEW v.1 | 11/23/2022 | APPROVED |
Conditions
Permit Number - TR-ROW-1022-00002
Permit Status: Complete
Permit Description: This is a Tucson Clean and Beautiful Neighborhood GSI projects. The project includes 9 back of curb rainwater harvesting basins with curb cuts and several microbasins. These basins will be planted with native trees and shrubs. The project is approximately 500 LF of excavation. The Bronx Neighborhood association has agreed to help maintain the site.
Date | Description | Comments |
---|---|---|
12/06/2022 | The following extended traffic control set-up times were approved: |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1022-00002
Permit Description: This is a Tucson Clean and Beautiful Neighborhood GSI projects. The project includes 9 back of curb rainwater harvesting basins with curb cuts and several microbasins. These basins will be planted with native trees and shrubs. The project is approximately 500 LF of excavation. The Bronx Neighborhood association has agreed to help maintain the site.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/14/2023 | TRSP - ROW - Recurring | Passed | Work completed area restored. | |
03/08/2023 | TRSP - ROW - Final/Close-Out | Passed | Work completed area restored. |