Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
695 S MAIN AV
Address NEW:
695 S MAIN AV
Apply Date:
09/15/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
Roadway work from Cushing St to 19th St along Main/10th Ave. Milling 5" of existing pavement and removing 5" of base. Replacing this with new AB along Main ave and lime treated subgrade from 18th St to 19th St. New asphalt, and new striping. One new ADA ramp with sidewalk.

Permit Reviews

Permit Number - TR-ROW-0926-01006
Permit Status: Inspections
Permit Description: Roadway work from Cushing St to 19th St along Main/10th Ave. Milling 5" of existing pavement and removing 5" of base. Replacing this with new AB along Main ave and lime treated subgrade from 18th St to 19th St. New asphalt, and new striping. One new ADA ramp with sidewalk.
Start Date Submittal Complete Date Status  
09/16/2026 RIGHT-OF-WAY REVIEW v.1 09/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01006
Permit Status: Inspections
Permit Description: Roadway work from Cushing St to 19th St along Main/10th Ave. Milling 5" of existing pavement and removing 5" of base. Replacing this with new AB along Main ave and lime treated subgrade from 18th St to 19th St. New asphalt, and new striping. One new ADA ramp with sidewalk.
Total Outstanding Activity Conditions - 3
Date Name
09/16/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination
09/16/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
09/16/2026 Traffic control set-up approved between 9AM - 3:30PM