Permit: TR-ROW-0826-00905
Permit Details
Apply Date:
08/18/2026
Applicant:
Alexis Otero-Morales
Description:
New Sewer main with 2 new manholes in street related to new subdivision. 10/07/2026 - Request for 30 Day Renewal as of 10/30/2026
Permit Reviews
Permit Number - TR-ROW-0826-00905
Permit Status: Inspections
Permit Description: New Sewer main with 2 new manholes in street related to new subdivision.
10/07/2026 - Request for 30 Day Renewal as of 10/30/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0826-00905
Permit Status: Inspections
Permit Description: New Sewer main with 2 new manholes in street related to new subdivision.
10/07/2026 - Request for 30 Day Renewal as of 10/30/2026
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/20/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/20/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 08/20/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/20/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0826-00905
Permit Description: New Sewer main with 2 new manholes in street related to new subdivision.
10/07/2026 - Request for 30 Day Renewal as of 10/30/2026
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | Passed | first day of mobilization. traffic control in place for roadway closure with active 811 marks in excavation area. | ||
| 08/31/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with Paul, reviewed scope of work, job duration, and restoration. Planning on setting up traffic control tomorrow. | |
| 10/06/2026 | Passed |