Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | Passed | first day of mobilization. traffic control in place for roadway closure with active 811 marks in excavation area. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | Passed | first day of mobilization. traffic control in place for roadway closure with active 811 marks in excavation area. |